4: 1971-75: I spent most of my time in the machine shops getting grease and oil all over my clothes, where I became absorbed in solving problems that troubled the shop floor (Gemba) and in research to test newly developed tools and processes.
10: 1973:An example of the irresponsibility of the Isuzu organization, measures to resolve problems in the start-up and measures to improve operational availability rate of the transfer machines for new large V-type diesel engine connecting rod machining- I
11: 1974:An example of the irresponsibility at Isuzu organization, measures to resolve problems in the start-up and measures to improve operational availability rate of the transfer machines for new large V-type diesel engine connecting rod machining- U